Stream Diversion in Central, PA
For a bridge restoration project (erosion-related damage) in central Pennsylvania, we created a stream diversion so that concrete could be poured under the bridge. We ran 200 feet of piping downstream and discharged it into a dissipator to slow the discharge.
Included in the system were:
- 12-inch corrugated hoses
- Two Atlas Copco PAC F1212 sound attenuated pumps
- Two Atlas Copco PAS F66 sound attenuated pumps
The project was approved by the local board of supervisors in
January 2024. Work began in March 2024 and concluded in May.